Start typing and press Enter to search

Sale!

Value Collection 3/8 ID 2-1/2 ft. Long Lead-In Whip Hose 1/4 Fitting, BD-KP1740 – 81010977

$24.78 $30.98
Review

Value Collection 3/8" ID 2-1/2 ft. Long Lead-In Whip Hose 1/4" Fitting,Manufacturer Part #: BD-KP1740S/N: 81010977UNSPSC: 40142009(Minimum Order Quantity=1, Package Quantity=1)



SKU: 81010977 Category:

Value Collection 3/8″ ID 2-1/2 ft. Long Lead-In Whip Hose 1/4″ Fitting,

Manufacturer Part #: BD-KP1740

S/N: 81010977

UNSPSC: 40142009

(Minimum Order Quantity=1, Package Quantity=1)

Reviews

There are no reviews yet.

Be the first to review “Value Collection 3/8 ID 2-1/2 ft. Long Lead-In Whip Hose 1/4 Fitting, BD-KP1740 – 81010977”

Your email address will not be published. Required fields are marked *