Start typing and press Enter to search

Sale!

Value Collection 3/8 ID 1-1/2 ft. Long Lead-In Whip Hose 1/4 Fitting, BD-KP1739 – 53608212

$25.42 $31.78
Review

Value Collection 3/8" ID 1-1/2 ft. Long Lead-In Whip Hose 1/4" Fitting,Manufacturer Part #: BD-KP1739S/N: 53608212UNSPSC: 40142009(Minimum Order Quantity=1, Package Quantity=1)Specifications:Hose TypeLead-In Whip HoseLength Ft. (Feet)1-1/2TypeLead-In Whip



SKU: 53608212 Category:

Value Collection 3/8″ ID 1-1/2 ft. Long Lead-In Whip Hose 1/4″ Fitting,

Manufacturer Part #: BD-KP1739

S/N: 53608212

UNSPSC: 40142009

(Minimum Order Quantity=1, Package Quantity=1)

Specifications:

Hose Type Lead-In Whip Hose Length Ft. (Feet) 1-1/2 Type Lead-In Whip Hose Material Polyurethane Inside Diameter (Inch) 3/8 Fitting Size 1/4 Length 1-1/2 UNSPSC Code 40142009

Reviews

There are no reviews yet.

Be the first to review “Value Collection 3/8 ID 1-1/2 ft. Long Lead-In Whip Hose 1/4 Fitting, BD-KP1739 – 53608212”

Your email address will not be published. Required fields are marked *